Closes in 26 days
The deadline is December 23, 2026.
C3 Medium & Heavy-Duty Electric Vehicle Charging Infrastructure Program
Funding to build charging depots for electric medium and heavy-duty trucks near the I-95 corridor and adjacent New Jersey roads.
About this program
Up to $84 million total for at least six charging depots, funded by the EPA Climate Pollution Reduction Grant as part of the Clean Corridor Coalition. Awards are for total project cost or per kW, whichever is lower (up to $750/kW for ports under 700 kW; up to $1,500/kW at or above 700 kW). Sites must be in New Jersey, new construction or capacity expansion, within five miles of a designated C3 corridor interchange, with at least 2.5 MW per site and 250 kW per port. Questions are due November 30, 2026 by 5:00 p.m. ET; proposals are due December 23, 2026 by 5:00 p.m. ET. A second NOFA may follow if funds remain.
Eligibility
Local governments, corporations, joint ventures, LLCs, cooperatives, partnerships, sole proprietorships/individuals, educational institutions, and tribal organizations, individually or as teams.
Requirements
- Site located in New Jersey and within five miles of a designated C3 corridor interchange or exit
- New construction without existing charging, or capacity expansion at an existing site
- Minimum 2.5 MW per site and 250 kW per port